ReadonlybusySmoothed busy/budget ratio (one-pole EMA, advanced once per RT cycle).
ReadonlybusyPeak busy/budget ratio since the previous reading (read + cleared at the engine).
ReadonlycyclesCumulative count of measured cycles.
ReadonlyoverrunsCumulative count of cycles whose busy time reached the whole budget.
One RT load reading from the engine. All
busy*values are ratios of the real cycle budget — 0.5 = "half the cycle spent mixing" at ANY quantum; ≥ 1 = the whole budget was consumed and the cycle deadline was missed.busyPeakis peak-held by the engine and cleared on read (each reading answers "since the previous one");overrunscounts measured missed deadlines cumulatively;cyclescounts measured cycles — 0 means the engine has not processed yet, so the reading carries no signal.